Start-up of Smet Pile with their Woltman 55 piling rig. Fully equipped with Olivier drilling tools (auger head d36/56 and drilling pipes d324 coupled with the Olivier coupling) for soil displacement screw piles.
- Casing for secant pile wall 19m
- New casing adaptor for secant