Soetaert working with two Liebherr LRB355 machines. These are equipped with Olivier drilling tools for full displacement piles. With a drilling torque of 45ton/meter, Olivier piles are made with an Olivier auger head d56/76. We always provide the necessary support and training to make a perfectly shaped Olivier pile in the ground.
- Extendable undercarriage for CAT 320C
- FDP Auger heads for overseas clients