Sometimes we also make traditional Full displacement tools. This is a FDP auger head with a diameter of 610mm. It is equipped with a Olivier coupling for drilling with a torque up to 55t/m in an open concrete system. Concrete and reinforcement are placed through the pipes and auger head. The bottom is sealed with a ProFound Drill Tips type Pro300.
Note: Auger heads for traditional FDP piles are only produced upon special request. This system has been replaced by the Olivier DPA system, which offers numerous advantages, including increased efficiency, reduced wear, and optimized soil displacement.
For more details, see Olivier DPA.
